ACRONIS Backup & Recovery 11.5 Server for Windows User's Guide Page 225

  • Download
  • Add to my manuals
  • Print
  • Page
    / 275
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 224
225 Copyright © Acronis International GmbH, 2002-2012
12.1.2.3 Task states
A task can be in one of the following states: Idle; Waiting; Running; Need interaction. The initial task
state is Idle.
Once the task is started manually or the event specified by the schedule occurs, the task enters
either the Running state or the Waiting state.
Running
A task changes to the Running state when the event specified by the schedule occurs AND all the
conditions set in the backup plan are met AND no other task that locks the necessary resources is
running. In this case, nothing prevents the task from running.
Waiting
A task changes to the Waiting state when the task is about to start, but another task using the
same resources is already running. In particular, more than one backup tasks cannot run
simultaneously on a machine. A backup task and a recovery task also cannot run simultaneously,
if they use the same resources. Once the other task unlocks the resource, the waiting task enters
the Running state.
A task may also change to the Waiting state when the event specified by the schedule occurs but
the condition set in the backup plan is not met. See Task start conditions (p. 98) for details.
Need interaction
Any running task can put itself into the Need interaction state when it needs human interaction
such as changing media or ignoring a read error. The next state may be Idle (if the user chooses
to stop the task) or Running (on selecting Ignore/Retry or another action, such as Reboot, that
can put the task to the Running state.)
12.1.2.4 Task statuses
A task can have one of the following statuses: Error; Warning; OK.
A task status is derived from the result of the last run of the task.
Status
How it is determined
How to handle
1
Error
Last result is "Failed"
Identify the failed task -> Check the task log to find out the
reason of the failure, then do one or more of the following:
Remove the reason of the failure -> [optionally] Start the
failed task manually
Edit the failed task to prevent its future failure
2
Warning
Last result is "Succeeded
with warning" or the
task has been stopped
View the log to read the warnings -> [optionally] Perform
actions to prevent the future warnings or failure.
3
OK
Last result is
"Succeeded" or "Not run
yet"
"Not run yet" means that the task has never been started or
has been started, but has not finished yet and, therefore its
result is not available. You may want to find out why the
task has not started so far.
Page view 224
1 2 ... 220 221 222 223 224 225 226 227 228 229 230 ... 274 275

Comments to this Manuals

No comments